Custom boxes, straight lines, doors that close right the first time.

Kitchen Cabinet Remodel Nashville TN Built to Last

A kitchen cabinet remodel Nashville TN homeowners can actually live with starts with boxes that are square and doors that don't sag. We build and install shaker cabinets, plywood boxes, and soft close hinges across Davidson County, and we handle the countertop and backsplash while we're at it. If your current cabinets are worn out, water damaged, or just laid out wrong, we'll walk your kitchen, tell you what's worth saving, and give you a straight number before anything gets ordered.

↗
Fast online booking

Request service today

Tell us what is happening. Our local team will confirm your visit shortly.

No spam. No obligation. Just practical help.
Thanks — we'll call shortly to confirm your visit.
Kitchen Cabinet Remodel in Nashville, Tennessee
Careful work. Honest options.
About this service

What a Kitchen Cabinet Remodel Nashville TN Really Involves

A kitchen cabinet remodel Nashville TN is the removal and replacement, refacing, or full rebuild of your cabinet boxes, doors, drawers, and hardware, plus the countertop and backsplash work that has to follow. It is not a paint job. We pull the old doors, check the boxes for square and rot, and decide what stays. Water damaged cabinet boxes near the sink usually go. Solid plywood boxes in a 1990s Green Hills kitchen often stay, and we reface them instead. Every job starts with a laser level on the wall and a stud finder in hand, because cabinets hung out of level will show it in the doors for the next twenty years.

Most Nashville homeowners call us for one of three reasons: the layout wastes space, the finish is shot, or a leaky kitchen sink quietly ruined the cabinet base. In older East Nashville and Inglewood homes, we regularly find mold behind backsplash tile and uneven kitchen flooring that has to be leveled before new cabinets go down. If you're searching for a kitchen cabinet remodel near me Nashville TN, the honest answer is that the scope changes block by block. A 12South bungalow and a Brentwood build are two different jobs, and we price them that way.

  • ✓ Storage You Can Reach
  • ✓ Doors That Stay Aligned
  • ✓ A Layout That Works
  • ✓ Water Damage Stopped Cold
What's included

What Our Cabinet Remodel Covers

The cabinet scope is the core of the job. Countertops, backsplash, and flooring are quoted alongside it because they follow the cabinets and doing them separately costs more. Here is what comes standard.

✓

Cabinet Removal and Haul-Off

We pull the old doors, drawers, and boxes, protect the flooring, and haul the debris. The wall gets checked for water damage and out-of-square framing before anything new goes up.

✓

New Boxes and Doors

Plywood or MDF boxes depending on the budget, built square and hung level with a laser level and shims. Door style is your call, from shaker to slab, in the finish you pick.

✓

Hardware and Glides

Soft close hinges and full-extension drawer glides on every door and drawer. We set the reveal with cabinet clamps and check it before we leave, so nothing rubs and nothing sags.

✓

Sink and Appliance Cuts

We cut the cabinet base for the undermount sink or farmhouse sink and build the openings to the appliance cut sheet, so the fridge and range sit flush instead of proud.

✓

Countertop and Backsplash Coordination

We template the countertop the day the boxes are final and set the backsplash tile after. Quartz, granite, marble, and butcher block all get the same sequence so the fit is right the first time.

How it works

How Our Cabinet Remodel Process Runs

01

Walk and Measure

We come out, measure every wall, check the boxes for square and rot, and photograph the plumbing and electrical behind the current cabinets. You get a written scope and a fixed price, usually within 48 hours. No charge for the visit.

02

Design and Order

You pick door style, finish, and layout. We spec the boxes, drawer glides, and soft close hinges, and confirm countertop material and backsplash tile at the same time so nothing arrives late. Custom orders from KraftMaid or Merillat run three to five weeks, and we schedule demo around that date, not before it.

03

Demo and Prep

One to two days. We pull the old cabinets, protect the flooring, and check the wall for water damage, mold behind backsplash, and out-of-square framing. If the wall needs work, we do it now, because hanging new boxes on a bad wall is how you get a two-year callback.

04

Install

Three to five days for a typical kitchen. Boxes go in level and shimmed, screwed into studs, then doors, drawers, and hardware. We cut for the undermount sink and the range hood, and we set the countertop template the day the boxes are final. Electrical for LED under cabinet lighting gets run to code while the wall is open.

05

Finish and Walkthrough

Countertops set, backsplash tiled, caulk lines run with a caulking gun, and the toe kick installed. We clean up, haul the debris, and walk the kitchen with you. Anything on the punch list gets handled before we call the job done, and you get the warranty paperwork the same day.

Tools & methods

Tools and Methods We Bring to the Job

Purpose-built equipment, used by trained technicians — so the job is done accurately the first time.

Laser Level

Sets the datum line for the whole cabinet run. Every box gets checked against it before it is screwed off, which is how a long run stays flat.

Stud Finder

Finds the framing behind plaster or drywall so cabinets get screwed into studs, not just the substrate. Critical in older Nashville homes with irregular framing.

Miter Saw and Table Saw

Cuts fillers, scribes, and toe kick to fit the wall. A scribed filler hides an out-of-square wall better than a fat caulk line ever will.

Oscillating Multi-Tool and Jigsaw

Cuts openings for the sink, outlets, and appliance boxes cleanly without blowing out the cabinet face. The multi-tool handles the tight cuts a saw cannot reach.

Cabinet Clamps

Hold doors and face frames aligned while the hinge screws go in. This is the tool that keeps the reveal even across a full run of doors.

Caulking Gun

Runs the final caulk line at the wall and countertop. A clean bead is the difference between a finished kitchen and a job that looks unfinished.

Real results

Before and after.

Galley Kitchen Rebuilt in Inglewood

Before

A 1952 bungalow with original painted cabinets, doors that would not close, and a pantry that was a single shelf behind a door. The plaster wall behind the sink was soft from a slow leak.

After

We refaced the solid boxes, replaced the sink base, and built a full-height pantry cabinet. Soft close hinges on every door, LED under cabinet lighting on the existing circuit, and roughly 25 percent more usable storage in the same footprint.

Open Plan Cabinet Run in Brentwood

Before

A wall separated the kitchen from the living room, and the cabinet run was a closed U that isolated the cook. The layout was original to the 1990s build and the finish was worn through at the handles.

After

We took the wall down, framed to IRC and wired to NEC for the new open plan, and built a new cabinet run plus a four-sided island. Quartz countertops templated off the finished boxes, and the run reads as one clean line from the living room.

Condo Sink Base Rescue in The Gulch

Before

A slow leak under the sink had rotted the cabinet base and started mold behind the backsplash. The rest of the boxes were sound, but the kitchen smelled musty and the base was soft to the touch.

After

We replaced the failed supply line, treated the mold, installed a new sealed sink base, and refaced the remaining boxes with new doors and soft close hinges. The leak is fixed and the kitchen looks new without a full tear-out.

Problems we solve

Cabinet Problems We Fix Before They Spread

Most cabinet calls start as a cosmetic complaint and turn out to be a water or structure problem. Here is what we find most often in Nashville kitchens.

Ask a pro →
01

Water damaged cabinet boxes under the sink

We pull the damaged base, find and fix the leak at the faucet or supply line, treat for mold, and install a new base cabinet with a sealed interior. The repair happens before the new box goes in, not after.

↗
02

Outdated kitchen layout that wastes space

We re-plan the run with full-height cabinets, deep drawers, and pull-outs, and we move the plumbing or electrical only where it earns its keep. The new layout gets measured against how you actually cook.

↗
03

Worn out cabinets with failing hinges and glides

If the boxes are solid, we reface and re-hinge with soft close hardware for a fraction of replacement cost. If the boxes are failing, we replace. We check both before recommending either.

↗
04

Uneven kitchen flooring under the cabinet run

We level the floor under the cabinet footprint before install, using self-leveler or shims depending on the substrate. The boxes sit flat, the toe kick closes, and the countertop templates clean.

↗
Proof you can check

Licensed, Certified, and Accountable

✓
NARI Certified RemodelerNational Association of the Remodeling Industry
✓
NKBA Certified Kitchen DesignerNational Kitchen and Bath Association
✓
EPA Lead-Safe Certified FirmU.S. Environmental Protection Agency
✓
Tennessee Home Improvement LicenseTennessee Board for Licensing Contractors
✓
Davidson County Contractor LicenseDavidson County
Good questions

Cabinet Remodel Questions Nashville Homeowners Ask

(615) 909-7503 →

Most Nashville cabinet remodels run $8,000 to $28,000 for the cabinets alone, with a full kitchen including countertops and backsplash landing between $18,000 and $55,000 in 2026. Refacing a solid set of boxes starts around $4,500. Layout changes, custom sizes, and premium door styles push the number up; keeping the plumbing and electrical where they are pulls it down.

Reface if the boxes are solid, square, and dry; replace if there is water damage, rot, or the layout is wrong. We check the boxes with a level and a probe before recommending either. Nashville TN kitchen cabinet refacing saves roughly 40 to 60 percent versus replacement, but it cannot fix a sagging box or a bad layout, and we will tell you that straight.

Plan on two to four weeks from demo to final walkthrough for a standard kitchen. Custom cabinet orders take three to five weeks before demo even starts, so the calendar from signed contract to finished kitchen is usually six to nine weeks. Small kitchens and refacing jobs can wrap in seven to ten days.

The right answer is the crew that gives you a fixed price, shows you their license, and lets you walk a finished job. We carry the Tennessee Home Improvement License and Davidson County Contractor License, work to NARI Certified Remodeler standards, and will hand you references in your own neighborhood. Call us and judge for yourself.

Ready when you are

Get Your Kitchen Cabinet Remodel Nashville TN Priced

One visit, one written number, no charge. We will measure the kitchen, check the boxes, and tell you what is worth saving before you spend a dollar on cabinets. Call (615) 909-7503 and we will get you on the schedule this week.

Book a Free Measure (615) 909-7503 →
Request an appointment

Call our Nashville kitchen remodeler

Call (615) 909-7503 or email [email protected] and we will set up a walkthrough. We answer the phone during business hours and keep the 24/7 line open for emergencies. Most estimates get scheduled within a few business days, and we give you a written number before any work starts.

Call anytime(615) 909-7503Email the office[email protected]
Office hoursOpen 24 hours · 7 days a week
Request received — our team will be in touch shortly.
Tap to call(615) 909-7503