Design, permits, and construction handled by one crew

New Kitchen Remodel Nashville TN Built to Last

A new kitchen remodel Nashville TN homeowners can actually live through starts with a plan and a crew that shows up. We handle new kitchen installation Nashville TN from the first stud finder pass to the final caulk line, working in Downtown, Green Hills, East Nashville, and across Davidson County. If your cabinets are worn out or the layout fights you every morning, we build the kitchen that fixes it.

↗
Fast online booking

Request service today

Tell us what is happening. Our local team will confirm your visit shortly.

No spam. No obligation. Just practical help.
Thanks — we'll call shortly to confirm your visit.
Mendaro Tech serving Nashville, Tennessee
Careful work. Honest options.
About this service

What a New Kitchen Remodel Nashville TN Involves

A new kitchen remodel Nashville TN is the full rebuild of your cooking space, not a cosmetic refresh. We pull the old cabinets and countertops, correct the framing and plumbing behind the walls, run new electrical to code, and install new cabinet boxes, quartz countertops, a tile backsplash, and flooring. Every job starts with a laser level and stud finder pass so the layout is square before a single cabinet goes in. You get a kitchen that works with how you actually cook.

Most Nashville homeowners call us when the layout has stopped working. A 1950s galley in Woodbine with one outlet and no dishwasher space. A 1990s build in Antioch with water damaged cabinet boxes under the sink. We see the same problems across Davidson County: insufficient storage space, poor kitchen lighting, and worn out cabinets that no amount of paint will save. If you have been searching for a new kitchen remodel near me Nashville TN, that is usually the point where a rebuild beats another patch.

  • ✓ Storage That Fits Your Life
  • ✓ Lighting You Can Cook Under
  • ✓ Surfaces That Survive Daily Use
  • ✓ A Layout That Flows
What's included

What Is Included in a New Kitchen Build

Our scope covers the full rebuild from demo to handoff. You see every inclusion and exclusion in writing before work starts, so there is no guessing about what the price covers. Appliances are typically owner-supplied unless you ask us to spec them.

✓

Demo and Disposal

We remove old cabinets, countertops, flooring, and fixtures, then haul it all away. Floors get protected and dust barriers go up before demo starts so the rest of the house stays livable.

✓

Plumbing and Electrical Rough-In

New supply lines, drain runs, dedicated circuits, and outlet placement per NEC. We test before the walls close and schedule the rough-in inspection through Davidson County.

✓

Cabinets and Countertops

KraftMaid or Thomasville cabinet boxes set plumb and level, then templated quartz, granite, or butcher block countertops installed with clean seams and an undermount sink.

✓

Backsplash and Flooring

Ceramic tile or subway tile backsplash with sealed grout, plus porcelain tile, luxury vinyl plank, or hardwood flooring installed over properly prepped subfloor.

✓

Lighting and Ventilation

LED under cabinet lighting, task lighting over the range, and a range hood vented to the exterior. We check airflow so the kitchen does not hold steam and grease.

✓

Permits and Inspections

We pull the permits, meet the inspector at rough-in and final, and hand you the signed-off paperwork. That record matters when you sell the house.

How it works

How Our New Kitchen Build Process Runs

01

Walkthrough and Measure

We walk the kitchen, measure every wall, and check what is behind them. Stud finder and laser level come out first. You get a written scope and a realistic timeline, usually 5 to 8 weeks for a full rebuild. No surprises halfway through.

02

Design and Permits

Cabinet layout, countertop material, and lighting plan get locked in. We pull the Davidson County Contractor License permits and schedule inspections. If walls are moving, we confirm load-bearing status before demo day. This stage takes 1 to 2 weeks.

03

Demo and Rough-In

Old cabinets, counters, and flooring come out. We open the walls, correct framing, run new plumbing and electrical, and install new drywall. A drywall lift keeps the ceiling clean. Rough-in inspection happens before anything gets closed up.

04

Install Cabinets and Surfaces

New cabinet boxes go in plumb and level, set with cabinet clamps. Quartz or granite countertops get templated and installed. Tile backsplash, flooring, and the sink and faucet follow. This is the longest stretch, usually 2 to 3 weeks.

05

Final Punch and Handoff

We test every outlet, run the disposal and dishwasher, check the range hood ventilation, and caulk the seams. You walk the kitchen with us and flag anything that needs attention. Final inspection clears, and we hand over care instructions for the new surfaces.

Tools & methods

Tools and Standards We Build To

Purpose-built equipment, used by trained technicians — so the job is done accurately the first time.

Table saw and miter saw

Cutting cabinet fillers, trim, and flooring with clean edges. A sharp blade and a straight fence make the difference on visible joints.

Laser level and stud finder

Finding framing and setting cabinet lines plumb and level. Every cabinet run starts with both before a screw goes in.

Oscillating multi-tool and jigsaw

Cutting outlet openings in cabinet backs and trimming flooring around toe kicks without tearing up the material.

Drywall lift

Holding ceiling and upper wall drywall in place while it gets fastened. Keeps the ceiling flat and the seams tight.

Tile cutter and caulking gun

Clean cuts on ceramic tile and subway tile, and a controlled bead of sealant at sinks, backsplashes, and countertop seams.

Cabinet clamps and nail gun

Holding cabinet boxes tight while they are joined and fastened, and setting trim and face frames without splitting the wood.

Real results

Before and after.

Galley Kitchen in Woodbine Rebuilt

Before

A 1950s galley with painted-over cabinets, one outlet, and a floor that sloped toward the sink. The range sat under a cabinet with no vent hood, so grease collected on the ceiling.

After

New shaker cabinets, quartz countertops, porcelain tile flooring, and a vented range hood. Storage went up 25 percent in the same footprint, and the floor is level. The kitchen now has six outlets on dedicated circuits.

Antioch Water Damage Rebuild

Before

A 1990s kitchen with water damaged cabinet boxes under the sink, mold behind the backsplash, and a failing faucet. The owner had been putting towels under the sink for months.

After

The leak was fixed at the source, mold treated, and new plywood cabinets installed with a Moen faucet and undermount sink. New ceramic tile backsplash with sealed grout. The repair passed inspection.

Green Hills Wall Removed

Before

A closed-off kitchen separated from the living room by a load-bearing wall. The owner wanted an open plan but had been told it was not possible without major structural work.

After

We confirmed the wall was load-bearing, pulled the permit, built the beam, and opened the plan. A new island with electrical and seating anchors the space. The kitchen gained 120 square feet of usable open area.

Problems we solve

Kitchen Problems We Fix in Nashville Homes

Most kitchens we tear into have two or three of these problems stacked on top of each other. Here is what we find and how we fix it.

Ask a pro →
01

Outdated kitchen layout that fights the cook

We redraw the layout around how you cook, move the range or sink when plumbing allows, and add an island or peninsula where the room supports it. The new plan gets built to the drawing.

↗
02

Water damaged cabinet boxes under the sink

We pull the damaged boxes, fix the leak at the source, treat any mold, and install new plywood cabinet boxes rated for moisture. The fix is inspected before the new cabinets go in.

↗
03

Poor kitchen lighting and insufficient outlets

We run dedicated circuits per NEC, add LED under cabinet lighting and task lights, and place outlets where you actually use them. The electrical inspection signs off before drywall closes.

↗
04

Uneven kitchen flooring and failing subfloor

We check the subfloor, correct the framing, and install a proper underlayment before the new flooring goes down. Cabinets get set after the floor is flat, not before.

↗
Proof you can check

Licensed, Insured, and Inspected

✓
NARI Certified Kitchen and Bath RemodelerNational Association of the Remodeling Industry
✓
EPA Lead-Safe Certified FirmU.S. Environmental Protection Agency
✓
Tennessee Home Improvement LicenseTennessee Board for Licensing Contractors
✓
Davidson County Contractor LicenseDavidson County
✓
OSHA 30-Hour Construction SafetyOccupational Safety and Health Administration
Good questions

Kitchen Remodel Questions Nashville Homeowners Ask

(615) 909-7503 →

Most full rebuilds in Nashville run $45,000 to $95,000 in 2026, with mid-range projects landing near $60,000. A cosmetic refresh with new cabinets and counters can start around $25,000. Layout changes, moving plumbing, and luxury appliances push the number up. We give you a line-item scope so you see where the money goes.

The right answer is the crew that permits the work, shows you a written scope, and puts a NARI Certified Kitchen and Bath Remodeler on your job. Ask for the license, the insurance certificate, and two recent Nashville addresses you can drive past. We will hand over all of it before you sign.

A full new kitchen installation Nashville TN typically takes 5 to 8 weeks from demo to handoff. Cabinet lead times of 3 to 5 weeks are the usual bottleneck, so we order early. Cosmetic jobs with stock cabinets can finish in 2 to 3 weeks. Weather and inspection scheduling can add a few days.

Our scope covers demo, framing corrections, new plumbing and electrical rough-in, drywall, cabinets, countertops, backsplash, flooring, sink and faucet, and lighting. Permits and inspections are included. Appliances are usually owner-supplied unless you ask us to spec them. We list every inclusion and exclusion in the written scope before work begins.

Ready when you are

Start Your New Kitchen Remodel Nashville TN

One call gets you a walkthrough, a written scope, and a realistic timeline. We are licensed, insured, and permitted through Davidson County. Call (615) 909-7503 and tell us what your kitchen is doing wrong.

Get My Estimate (615) 909-7503 →
Request an appointment

Call our Nashville kitchen remodeler

Call (615) 909-7503 or email [email protected] and we will set up a walkthrough. We answer the phone during business hours and keep the 24/7 line open for emergencies. Most estimates get scheduled within a few business days, and we give you a written number before any work starts.

Call anytime(615) 909-7503Email the office[email protected]
Office hoursOpen 24 hours · 7 days a week
Request received — our team will be in touch shortly.
Tap to call(615) 909-7503